Setting up the control and protection system of the Mitsubishi MW701D unit of the Kazeroun Combined Cycle Power Plant

The project to replace the control and protection system of the Mitsubishi MW701D unit of the Kazeroun Combined Cycle Power Plant was launched by the Ahar team
The purpose of this project is to update the control and protection system, including design, the supply of relevant parts and accessories, installation and commissioning of the unit as an EPC, as well as in the next steps to eliminate dependence on external spare parts and reduce repair costs and defects. It is easier to find
This power plant has 6 gas units including 2 Mitsubishi units with a nominal capacity of 128 MW and 4 units of Ansaldo V94.2 and 3 Siemens steam units with a total production capacity of 1373 MW and having 230 and 400 kV substations as the largest power plant in the province and one It is one of the important production centers in the country