The project of designing, building, installing, and commissioning the dynamic stimulation system of unit 1 of the Sahand steam power plant was put into operation and delivered
Sahand power plant has 2 steam units with a capacity of 325 megawatts for each unit with a nominal excitation current of 170 amperes exciter
The Sanyar control system used in this project has the ability to rectify the input voltage with a frequency of 350 Hz. This project is designed as a complete extension of the control and power department, and for the first time, this dynamic excitation system has been installed and commissioned for a unit with a capacity of 325 MW