About Us
Contact Us
  • Main page
  • Technical Teams
    • Turbocompressor
    • Gas Ramyar
    • SANYAR
    • Steam’s Ramyar
    • Electronic cards
    • RAMONA
  • Turbine Control
    • Intro about gas turbine
    • Types of gas turbine
    • Introducing RAMYAR
    • Executive team of gas Ramyar
    • Completed projects
    • Projects in progress
    • Partners
  • Excitation System
    • Intro about excitation system
    • Types of excitation system
    • Introducing SANYAR
    • Executive team of SANYAR
    • Completed projects
    • Projects in progress
    • Partners
  • Electronic Cards
    • Intro about manufacturing cards
    • Introducing Ahar electronic’s Lab
    • producting sample
    • Completed projects
    • Excecutive team of electronic cards
    • Partners
  • Boiler Control
    • Intro about boiler & steam turbine
    • Types of steam turbine
    • Introducing RAMYAR 401
    • Executive team of steam’s Ramyar
    • Completed projects
    • Projects in progress
    • Partners
  • Contact Us
February 26, 2018
  • Electricity

Participation in the exhibition of turbine, generator and rotary machines

Ahar Power station services Co, as the most authoritative producer of control and protection systems for rotary machines, will be participate at the first International Exhibition of rotary machines.

February 12, 2018
  • Ahar Social News

Visiting tehran power managers from sanyar excitation system

Ahar Company was honored to host Dr. isapour (CEO of Tehran Thermal Power Company) along with other managers of Tehran’s power plants at the site of besat power plant.

February 4, 2018
  • Electricity

Signing a contract with Qeshm Movaled company by ahar

replacement of the turbine control system and the control system for generator excitation and protection of the two units of the Qeshm power plant has undertook during the contract by ahar .

February 4, 2018
  • Electricity

Signing Contract with the Iran’s oil and gas pipelines company

Ahar Powerstation Services Company signing a contract to replace the turbine control system of eight Typhoon turbo-pumps in Chamran’s pump station near Ahwaz for oil pipline co.

February 4, 2018
  • Ahar Social News

Visit of Engineers of Abniro’s Bandar Imam Khomeini Petrochemical Co

Ahar company was honored to be hosted by a group of managers and specialists from Abniro’s Bandar imam Khomeini Petrochemical Company that visited the Ahar to support domestic manufacturers

February 4, 2018
  • Ahar Social News

Visiting Tehran power Production Management Company’s directors from ahar

Ahar Company was honored to host a group of directors and specialists from Tehran Power production Management Company, this meeting was to support domestic manufacturers

Categories


  • Ahar Social News
  • Electricity
  • Uncategorized

Latest Posts


  • Ahar in the 25th Tehran Oil, Gas and Petrochemical Exhibition
  • Important consultations at this year’s oil exhibition (2018), narrated by the images
  • Participation in the 23th Tehran International Oil Show
  • Participation in the exhibition of turbine, generator and rotary machines
  • Visiting tehran power managers from sanyar excitation system

Popular Posts


  • Participation in the 23th Tehran International Oil Show
  • 22nd Tehran International Oil and Gas Exhibition
  • Manufacturing the first Iranian DCS for the SPGC company
  • Visit of Engineers of Abniro’s Bandar Imam Khomeini Petrochemical Co
  • Signing Contract with the Iran’s oil and gas pipelines company

Search


Archive


  • March 2021
  • May 2018
  • February 2018
  • November 2017
  • October 2017
  • May 2017
  • November 2012

Make it different

Get a Quote

Please enter CAPTCHA code
captcha

Ahar building, science and tech park, 12th km Asian Rd, Mashhad, Iran

Unit 75, Floor 13, Mina Tower, NO 40, Kashani St, Tehran, Iran

05135424100 (10 lines)

05135424161

 info@aharco.com
Secretary mail@aharco.com
Supply Dept. supply@aharco.com
Sale Dept. sale@aharco.com

Copyright © 2017 Ahar Co. All rights Reserved.

Website design and development by Mammute